Con4Mare delivered comprehensive Marine Warranty Survey services for the TetraSpar Floating Wind Demonstrator project. Our scope included load out, seafastening, transport including interim transports, installation, as well as pre-accompanying services. The TetraSpar Demonstrator, now commissioned and operational, features a unique floating foundation designed to support a 3.6 MW wind turbine. The project aims to demonstrate the feasibility and efficiency of floating wind technology in deeper waters.
TetraSpar floating wind demonstrator
Marine Warranty Survey

Project Scope
Quick Overview
- •Load Out, Seafastening, Transport incl. Interim Transports, Installation
- •Pre Accompanying Services
Facts
Con4Mare
Client
TetraSpar Demonstrator ApS
Project Phase
Installation & Commissioning
Duration
2019-2021