For the Hohe See/Albatros – Inter Array Cables project, Con4Mare provided extensive Marine Warranty Survey Services. These services included detailed document review and on-site supervision for critical phases such as load out, sea fastening, transport, and installation. A total of 130 km of sea cables were installed for the array cabling, connecting 87 turbines across the two wind farms. This ensured all operations were conducted safely and in compliance with industry standards, supporting a total capacity of 609 MW and supplying approximately 710,000 households annually.