HVDC Platform
Overview
Client
Nordic Yards Holding GmbH
Duration
2015 – ongoing
Project Phase
Engineering, Installation and Post-Installation
Services
Engineering and Projects
Marine Services
QHSE Services
Offshore Professionals
Scope
- Interfacing with the platform designer, certifier, independent experts, fabrication yard, client and offshore contractor
- Development of alternative Method of Installation for cable access towers
- Specification, mockup trials and supervision of offshore installation of seabed preparation
- Development of a Concept for removal of support structure for cable access towers
- Specification and Design of an appliance to improve the on-bottom stability of the jackets during piling
- Engineering Work Packages regarding offshore positioning surveys and field layout
- Preparation of Technical Specifications for grouting works, tension bolts and offshore welding works
Client
GE – Grid Solutions
Duration
2017 – ongoing
Project Phase
Commissioning, Operation & Maintenance
Services
Engineering and Projects
Marine Services
QHSE Services
Offshore Professionals
Scope
- Preparing safety documentation for TLQs to get BSH approval:
- Hosting a Hazard Identification (HAZID) workshop:
- Provision of:
– Develop evacuation study for TLQ phase
– Develop fire protection concept for TLQs
– Amending fire control and safety plan
– Amending escape and rescue plan
– Develop method statement for waste water handling
– Provision of a qualified chairman to guide through the workshop
– Technical preparation of the workshop according to the client’s requirements
– Documentation of the HAZID outcome upon workshop termination
– Offshore Installation Managers
– PTW Coordinators
– Offshore Medic
– Control Room Operators
– Site Supervisors
– Deck Foremen/Crane Coordinators (ERT-Leader)
– Crane Operators Stage 3 (ERT-Member)
– Banksmen / Slinger (ERT-Member)
– Fire Watch Team
– Safety Documentation for TLQs to get BSH Approval
– HAZID workshop